Hi Patch / Nemo
Once we removed the laser and ldd from 25-47 the doubling problem was solved... Now
Pls find attached image describes image problem that we faced in 48 laser Lbox changed machine..
1. fine small lines on edge of the image which is mentioned in the attachment..
2. fine vertical slantical lines over the image and dot which looks like moire..
Apart from elevation and delay test we have done everything...
Kindly clarify what is the purpose of doing elevation and delay test...ELEVATION ADJUSTMENT IS DONE WHEN THE FOCUS CHANGES ACCROSS THE DRUM
DELAY ADJUSTMENT IS MADE WHEN THE LINES ACCROSS THE PLATE DO NOT APPEAR SOLID AND STRAIGHT
UNIFORMITY ADJUSTMENT IS MADE WHEN SOME OF THE DIODES ARE WEAKER THAN THE REST.
RE. YOUR PROBLEM HAVE YOU REPLACED THE DDB BOARD AND BOOTED THE LOTEM WITH ALL THE DOORS CLOSED?
IS THE LOTEM OK WHEN USING 24 DIODES ( THE FIRST OR THE LAST?)
YOU COULD STILL HAVE A PROBLEM WITH THE STROBE BD./MCF BD/ AN LDD BOARD OR EVEN A MECHANICAL PROBLEM WITH THE LEAD SCREW/CARRIAGE/
One more clarification i have seen laser uniformity test in Prinergy Xpo calibration..
Its better to clarify what is the usuage of that and how to do the calibration and settings in Laser uniformity test... Any idea???