Polar 76 Em - Error code 68.

zamir

Member
Any help?

My polar, SN 6461339 shows this Error code.
It cuts but is not programable.

Thanks,
Zamir.
 
Hi sir,
In programm # 0 the measurement for special false clamp plate,has been stored, either being smaller than 1,8 cms or large than 35 cms.

Let me know, sincerely

Blessing
[email protected]
Mobile+WhatsApp; + 505 8861 1441
Managua, Nicaragua Central America
 
Thank you, Chock.

This is my machine as attached.
How do I get into program #0?
I don't understand what you mean
by "false clamp plate".
Can you explain, please?

Thanks.
 

Attachments

  • WhatsApp Image 2022-08-07 at 14.53.47.jpeg
    WhatsApp Image 2022-08-07 at 14.53.47.jpeg
    131.2 KB · Views: 244
please use the Operator Manual, and look for false clamp

Select P+ and P_ simultateously, program indication flashes,enter programm 0 and terminate by =

By mean S+ AND S- ,respect you can select the steps of programms 0, the values are indicates in the nominal display.


Insert service jumper into in plug board IAR, IN THIS WAY, the correction display turn OFF.

1)Step special false clamp (width +10mms)

2) BrAKE After Run(nomia 0.025-0.05cm)

3) Slow down travel

4) Delete programm coompletely ( push buton Delete , push button mark

Blessing
[email protected]
Mobile+WhatsApp; + 505 8861 1441
Managua, Nicaragua Central America
 
Thank you, my friend.

I firstly have to find the Operator Manual of this model.
Do you have one?
Can you please send me the relevant page?

Thanks again.
 
My apologize for the delay in reply, but i have my wife with cancer +chemical therapy .
Send me his email, for to send you the Operator Manual, since is heavy the server, No support the file.

Blessing
[email protected]

Mobile+WhatsApp; + 505 8861 1441
Managua, Nicaragua Central America
 
Hi Mr Zamir;

Please see his email, i did send you the O. M for POLAR 76 EM

Blessing
[email protected]
Mobile+WhatsApp; + 505 8861 1441
Managua, Nicaragua Central America
 

PressWise

A 30-day Fix for Managed Chaos

As any print professional knows, printing can be managed chaos. Software that solves multiple problems and provides measurable and monetizable value has a direct impact on the bottom-line.

“We reduced order entry costs by about 40%.” Significant savings in a shop that turns about 500 jobs a month.


Learn how…….

   
Back
Top