Search results

  1. adam470

    Accuset 800 job time outs V2

    Hi this is a continuation of this thread http://printplanet.com/forums/agfa-systems/22350-accuset-800-job-time-outs I have reinstall the PAC pci card, RIP software and drivers i have made a new cable using the pin out in the attachment which i copied from the old cable and I'm not sure if its...
  2. adam470

    Accuset 800 job time outs

    Hi this is a continuation on a previous thread "help with accuset 800" The rip I’m using is apogee s2v2 up6 on w2k I am still getting job time outs with this message in the pilot imaging window 05/06/2010 10:31:15 AM - No on-line processor present 05/06/2010 10:31:15 AM - Connected to engine...
  3. adam470

    Help with Accuset 800

    Hi can anybody help me with this accuset i'm trying to print film and the jobs just time out and i get this message 26/05/2010 07:18:03 PM - Job 'GrouseRecordsFilm.pdf' (205) started 26/05/2010 07:18:03 PM - Page 1 : Plane 'Gray' started 26/05/2010 07:18:05 PM - Page 1 : Plane 'Gray' ended...
  4. adam470

    AGFA DryStar 5500

    Dose anybody know anything about the AGFA DryStar 5500 its a medical imager but i was wondering it could be used to print graphics
  5. adam470

    Processor Problem glun/jen D510

    Hi i have a Glunz Jensen D510 processor which blows the F509 Transf. Prim. fuse i replaced the fuse when the processor was dry and started it up and every thing seem fine but when i fill it and attach the water the fuse blew again has anyone had this problem before or know what i can do to get...
  6. adam470

    Agfa Apogee PDF RIP S2 V2

    Hello i have apogee pdf rip s2 v2 i have the manuals the dongle and everything but the install disk is no good can anyone help me out with a backup copy. you could use nero to make an iso image then you can ftp it to me let me know if you can help me out and i'll send you the ftp details. any...

PressWise

A 30-day Fix for Managed Chaos

As any print professional knows, printing can be managed chaos. Software that solves multiple problems and provides measurable and monetizable value has a direct impact on the bottom-line.

“We reduced order entry costs by about 40%.” Significant savings in a shop that turns about 500 jobs a month.


Learn how…….

 
Back
Top