Hi All,
I'm currently facing a challenge in determining the pricing for large orders with split billing and shipping. While I intend to be fair and reasonable, I also want to ensure we don't miss out on potential revenue.
The orders we receive vary in terms of artwork. Some have identical artwork, while others have unique designs based on their locations. Additionally, we encounter orders that contain a mix of both. Furthermore, some orders are billed to a single central location but require split shipping, whereas others are billed and shipped to multiple locations.
I would appreciate your input on how to approach the pricing for the following jobs:
Job A:
Quantity: 50,000 brochures (with identical artwork)
Billing: One central location
Shipping: 50 different locations
Job B:
Quantity: 50,000 brochures (with identical artwork)
Billing: 50 separate locations
Shipping: 50 separate locations
Job C:
Quantity: 50,000 brochures (with identical artwork)
Quantity: 50,000 flyers (with different artwork - 50 files, 1,000 each)
Billing: 50 separate locations
Shipping: 50 separate locations
In the past, I priced Job A based on the total quantity ordered, factoring in sorting/bundling and shipping costs. However, Job B and Job C have introduced additional complexities that require a different pricing strategy.
Thank you for your assistance!
Best regards,
Joe
I'm currently facing a challenge in determining the pricing for large orders with split billing and shipping. While I intend to be fair and reasonable, I also want to ensure we don't miss out on potential revenue.
The orders we receive vary in terms of artwork. Some have identical artwork, while others have unique designs based on their locations. Additionally, we encounter orders that contain a mix of both. Furthermore, some orders are billed to a single central location but require split shipping, whereas others are billed and shipped to multiple locations.
I would appreciate your input on how to approach the pricing for the following jobs:
Job A:
Quantity: 50,000 brochures (with identical artwork)
Billing: One central location
Shipping: 50 different locations
Job B:
Quantity: 50,000 brochures (with identical artwork)
Billing: 50 separate locations
Shipping: 50 separate locations
Job C:
Quantity: 50,000 brochures (with identical artwork)
Quantity: 50,000 flyers (with different artwork - 50 files, 1,000 each)
Billing: 50 separate locations
Shipping: 50 separate locations
In the past, I priced Job A based on the total quantity ordered, factoring in sorting/bundling and shipping costs. However, Job B and Job C have introduced additional complexities that require a different pricing strategy.
Thank you for your assistance!
Best regards,
Joe