I have a variable data job that is taking a long time to complete. The finished size is small, so we can fit 192up on our press sheet (48x24). I’m able to get everything working correctly, except when I try to create the job with the imposition applied. SSD seems to hang up during the “Creating TIFF” stage.
I eventually got the job to finish...94344 records, 492 sheets at 192up. It took about 3 hours 20 minutes to create the job.
I’ve found that using a smaller sheet size works much faster. Is there a limit to the sheet size or number up that SSD can handle? Is there anyway to get this to complete faster? I've tried working locally instead from our server, but that hasn't saved any time.
Please note that the artwork doesn’t contain any images…it’s really a pretty simple variable data job. I do have one rule applied for switching layers.
Any advice would be great! THANKS!!
I eventually got the job to finish...94344 records, 492 sheets at 192up. It took about 3 hours 20 minutes to create the job.
I’ve found that using a smaller sheet size works much faster. Is there a limit to the sheet size or number up that SSD can handle? Is there anyway to get this to complete faster? I've tried working locally instead from our server, but that hasn't saved any time.
Please note that the artwork doesn’t contain any images…it’s really a pretty simple variable data job. I do have one rule applied for switching layers.
Any advice would be great! THANKS!!