Hi,
(Sorry for my poor english)
I'm in charge of a small printing shop. A lot of things are going through me : price estimation, pre-press, press operation, buying, problem resolution.
The shop is growing but there's a lot production problems :
We are using printing docket with all the information to complete the job. Sample for color matching from the last time the job was printed, approval sheet with the last modifications, the last docket to compare information if needed....time sheet,
The time sheet form include a small check list (10 points) per department: Design, prepress, printing, finishing. All department can leave a comments about problem production : missing information, technical problem, printing machine problem...
There is a short meeting every morning to established priority jobs for the day and take the feelings from everybody and their idea or commnets.
I am trying to be everywhere, but now, with de business growing I can't.
All those tools seem to be working (GOOD) for me...but they don't work for others. After, a production error, they seemed to be shocked but 2 or 3 days after another problem happens...
- color miss match
- wrong file printed
- missing bleed
- score to stong
- etc...
I don't wanna be part of the problem, i am working to hard for so long time...
P.S. cannot write a 500 points check list ? cannot fired everybody ?
Thank you for any suggestions.
Grafika
(Sorry for my poor english)
I'm in charge of a small printing shop. A lot of things are going through me : price estimation, pre-press, press operation, buying, problem resolution.
The shop is growing but there's a lot production problems :
We are using printing docket with all the information to complete the job. Sample for color matching from the last time the job was printed, approval sheet with the last modifications, the last docket to compare information if needed....time sheet,
The time sheet form include a small check list (10 points) per department: Design, prepress, printing, finishing. All department can leave a comments about problem production : missing information, technical problem, printing machine problem...
There is a short meeting every morning to established priority jobs for the day and take the feelings from everybody and their idea or commnets.
I am trying to be everywhere, but now, with de business growing I can't.
All those tools seem to be working (GOOD) for me...but they don't work for others. After, a production error, they seemed to be shocked but 2 or 3 days after another problem happens...
- color miss match
- wrong file printed
- missing bleed
- score to stong
- etc...
I don't wanna be part of the problem, i am working to hard for so long time...
P.S. cannot write a 500 points check list ? cannot fired everybody ?
Thank you for any suggestions.
Grafika