kaiserwilhelm
Well-known member
We have a very large customer that has made the move to CC2014. We have as well.
We are receiving their zip files with packages of Links / Document Fonts, etc.
However, basically since the introduction of CC2014, we are having serious issues with "yellow triangles". Dates on the INDD files not jiving with the Links folder.
No, this is not a case of the zip file being expanded on a PC or something and the date changing to today.
The date still shows Aug 13, or Feb 11. BUT, the INDD file is not calling for dates like that.
I notice that during packaging there is now a new button that can be clicked - Update Graphics Link In Package
Could this be causing the issue?
We are receiving their zip files with packages of Links / Document Fonts, etc.
However, basically since the introduction of CC2014, we are having serious issues with "yellow triangles". Dates on the INDD files not jiving with the Links folder.
No, this is not a case of the zip file being expanded on a PC or something and the date changing to today.
The date still shows Aug 13, or Feb 11. BUT, the INDD file is not calling for dates like that.
I notice that during packaging there is now a new button that can be clicked - Update Graphics Link In Package
Could this be causing the issue?