Yookaroo
Active member
Just thought I would let you guys know how much fun I have had with my purchase of the new C8000. We are located in Mississauga Canada, so your results may vary.
Here is the letter with issues I just sent my Konica Minolta Rep.
Well First off let me start this by saying its now been 21 days since we took delivery of the C8000.
Its still at this point completely unusable. Please note the following reasons that we would like our deposit back and the machine removed.
After we were asked to sign off on the machine we found boxes with the heater/humidifier, that was never opened or installed
So our C8000 isn’t finished yet, we have no supplies for it even if it was and to top it off it can’t do the work we bought the machine for in the first place!!! That’s right we run mainly 300+ gsm stock and our only output device the Stacker doesn’t support it it can only handle 240 gsm. So in the end the machine is useless to us as we run 20 to 30 thousand postcards at time, we would have to have a full time employee just taking the stock off the machine
Please let us know how soon we can expect our deposit back and what day the machine will be removed by.
Here is the letter with issues I just sent my Konica Minolta Rep.
Well First off let me start this by saying its now been 21 days since we took delivery of the C8000.
Its still at this point completely unusable. Please note the following reasons that we would like our deposit back and the machine removed.
- Wrong Power specs and no pre site survey that caused a delay with install
- The Feeder arrived days after the machine
- When techs did come to install we overheard them on several occasions saying they didn’t know how the machine went together this really instilled confidence
- The techs made a complete mess of our shop they were given bins to put paper in and pails to put plastic in instead they just made piles everywhere, this was requested removed over 5 days ago its still here.
- The Tech who came to install our RIP, didn’t see the box for it so he told us we weren’t getting one??? Don’t you guys have work orders?
- As we got near the end the machine sat several days as techs called us to say they would be in and didn’t show up
- Then your techs showed up for the software part, said it was done and left, when the trainer came in he noticed we didn’t have a Fiery license to print, and that several components werent installed, he blamed the RIP tech, when the RIP tech came back he blamed the Trainer....
- As for the Trainer he just showed up early Monday, never called for an appointment, spent the day trying to get it running and then was disappointed that my staff couldn’t stay late to do the training. He said he would be back today... Havent heard from him yet.
- I asked Troy days ago to have Toner shipped to us so that we could get started, I saw the order placed on the 13th, it is now the 18th and nothing has arrived
After we were asked to sign off on the machine we found boxes with the heater/humidifier, that was never opened or installed
So our C8000 isn’t finished yet, we have no supplies for it even if it was and to top it off it can’t do the work we bought the machine for in the first place!!! That’s right we run mainly 300+ gsm stock and our only output device the Stacker doesn’t support it it can only handle 240 gsm. So in the end the machine is useless to us as we run 20 to 30 thousand postcards at time, we would have to have a full time employee just taking the stock off the machine
Please let us know how soon we can expect our deposit back and what day the machine will be removed by.
Last edited: